施工期水土流失估算及可靠性分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家"十五"科技攻关项目"水安全保障技术研究—中国分区域生态用水标准研究"(2001BA610A-01)


Estimation of Soil and Water Loss and Reliability Analysis in Engineering Construction Period
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    水土流失是生态环境建设的主要问题。对深圳市福田河综合整治工程施工期可能产生的水土流失量进行了估算,并给出了可靠性估计,提出了相应的水土保持措施。将随机可靠性作为水土流失评价的一个方面做了初步的探讨。

    Abstract:

    One major problem in re-establishing ecological system is soil and water loss.Through the project of comprehensive treatment of the Futian River of Shenzhen City, the quantity of soil and water loss caused during the engineering construction period is estimated, and the results of reliability and measurements of soil and water conservation are brought forward accordingly. As a primary point of discussion, the reliability analysis of water loss and soil erosion is probed as one aspect in environment evaluation.

    参考文献
    相似文献
    引证文献
引用本文

苏飞,胡嘉东,粟苏文.施工期水土流失估算及可靠性分析[J].水土保持通报,2004,(2):20-23,37

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2003-05-09
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-11-26
  • 出版日期: