从金沙江三滩泥石流沟发展趋势探讨整治方案
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Discussion on the controlling plan in view of Developing Trend of Mudrocke Flow in santan of the Jinsa River
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    三滩中桥沟是目前成昆铁路南段亟待整治的工点之一。本文在分析了三滩泥石流沟的危害,地质、地貌环境恶化的原因及发展趋势的基础上,提出了对三滩泥石流沟整治的两个方案:(1)拦排结合方案;(2)明洞渡槽方案。并对以上两个方案作了比较。

    Abstract:

    Chiaogou of Santan is at present one of the urgent top-priority to be controlled in the south section of Chenkun Railway line, Based on the analysis of damages caused by the mudrock flow,the worseninig of geological and geomorphological environment and the developing tendency in santan mudrock flow gully, this Paper suggests two plans for controlling over santan mudrook flow gully:(1)the combination of check- ing and drainage; and (2)the construction of open channel aqueduct, Also, the com- parison of two plans is made in this paper.

    参考文献
    相似文献
    引证文献
引用本文

谢修齐,姚一江.从金沙江三滩泥石流沟发展趋势探讨整治方案[J].水土保持通报,1991,(6):10-16

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-12-01
  • 出版日期: