Abstract:Based on the ten year data of the first period project for the four key control aid typicalinvestigation in yellow River basin,This paper analysed preserved rate of different control measuresin different type region,the relation between preserved rate and control cost.In addition,the ap-proaches of incresing preserved rate of measures are discussed in order to provide references for soiland water conservation in second period project.