溢洪道陡段侧墙高度优化设计
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

陕西省水土保持局项目资助(97013)


Height Design of Side Wall of Spil lway Steep Section
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过用迭代法求算临界水深和正常水深,使求水面曲线的方法简化。并依据此方法求算平均水深,由平均水深求算出水深为平均水深处相对于陡段首端的流程长度。据此将陡段侧墙从段首至平均水深处设计成段首水深加安全加高之高度,平均水深以下流程的侧墙则设计成平均水深加安全加高之高度,从而便于施工且使费用最小,为溢洪道陡段侧墙的设计、施工和预算造价提供了科学依据。

    Abstract:

    It makes the method of reckoning curve of water surface simple to calculate critical and normal water depth by using the alternative method, and then calculate average water depth according to the method. The flow length between the site which water depth equal to the average water depth and the head of steep section is calculated by average water depth. By this, the side wall of steep section of spillway from the head of steep section to the site of average water depth is designed as the height of water depth of head of section adding safety height.The side wall of flow below average water depth is designed as the height of average water adding safety height.This makes the construction convenient and cost smallest. These provided a scientific basis for design,construction and budget cost of side wall of spillway steep section.

    参考文献
    相似文献
    引证文献
引用本文

阮成江,康文平.溢洪道陡段侧墙高度优化设计[J].水土保持通报,2000,(2):22-23

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:1999-10-03
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-11-28
  • 出版日期: