西气东输管道工程陕西段新增土壤流失预测
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家“十五”特大型重点基础设施建设工程


Additional Soil Erosion Predication of Natural Gas Pipe Project from West to East in Shaanxi Province
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    西气东输管道工程陕西段全长346.20km,工程建设中扰动破坏原地貌和地表植被,产生大量弃土弃渣。经分析计算,新增土壤流失8.35×105t,其中扰动破坏原地貌新增土壤流失量为6.80×105t,占总流失量的81.41%;弃土弃渣流失量为1.55×105t,占总流失量的18.59%。扰动破坏原地貌造成新增土壤流失是防治的重点,必须采取切实可行的防治措施。

    Abstract:

    The overall length of Shaanxi Province from West-to-East-Natural-Gas-Pipe-Project is 346.2 km.Due to the project construction,vegetation on the original land has been distroyed with a consequence of large quantity of deserted soil,dregs and remains.According to analysis,newly additional soil erosion amounts to 8354000 tons,of which deserted soil is up to 6800 000 tons,occupying 81.40 percent out of the total volumn,deserted dregs and remains is to up to 1553000 tons,occupying 18.59 percent of the total.Practical measures are supposed to be taken to controll soil erosion caused by the project constrution

    参考文献
    相似文献
    引证文献
引用本文

付良勇,寇权,张鉴,王存荣.西气东输管道工程陕西段新增土壤流失预测[J].水土保持通报,2005,(4):44-47

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2004-05-23
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-11-26
  • 出版日期: