-种基于效益最大化分析的淤地坝建坝时序数学模型
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Sequential Mathematical Model for Warping Dam Construction Based on Maximal Economic Benefit
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对淤地坝坝系建设中存在的建坝时序问题,提出了淤地坝建坝时序的数学模型。该模型考虑的主要因素有:拦泥效益以及坝地的生产效益。按照效益最大化的结果求出最佳的建坝顺序。与其它模型比较,该模型的主要特点是考虑了三点实用的因素,即贴现率,保收率和建筑费。最后以虎山沟为例,使用该模型得到了建坝时序和效益,模型的合理性是通过计算的效益最大来证明的。

    Abstract:

    This article put forward a sequential mathematical model for warping dam construction in small watershed.The productive benefit and sediment holding capacity of the dam were considered as the main elements.The best const ruction sequence was based on the analysis of maximizing economic benefit.Comparing with other models, the model took three practical factors of discount rate, harvest insuring rate and constructive investment into account.Finally, the model was applied to Hushan small watershed to prove its rationality.

    参考文献
    相似文献
    引证文献
引用本文

何兴照,史丹,陈刚,金上海.-种基于效益最大化分析的淤地坝建坝时序数学模型[J].水土保持通报,2007,(6):71-74

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2007-08-16
  • 最后修改日期:2007-10-25
  • 录用日期:
  • 在线发布日期: 2014-12-16
  • 出版日期: