Anxious to Build Three Gorge Dam, Result in Harms to Four Modernizations and Bring Calamity to Future Generations——Report on An Investigation of Advantages and Disadvantages in Three Gorges Reserviors on July 30, 1985
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Three Gorges Project should not be started in the near future, at least during the Seventh Five Plan. The reasons are from: 1, its investment is as high as sixty billion yuan; 2, the flood prevention on the middle and lower reaches can not be solved, and the flood harm on the upper reaches may be strengthened; 3, the problem in choking with silt is solved with difficulty; 4, more disadvantages than advantages in shipping; 5, the less economic benefits for its enormal investment, longer building time and low rate of beneficial result; 6, the problem of emigration from reserior area is conducted with difficulty; 7, it may bring a disastrous consequences. At last, six abstracts of reports of on-the-spot investigation are enclosed.

    Reference
    Related
    Cited by
Get Citation

.急建三峡大坝,危害四化,殃及后代(续)—关于三峡工程利弊的几点结论[J].水土保持通报英文版,1987,(6):56-62

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 01,2014
  • Published: