The formative conditions of Luhuagou debris flow and its control projects
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The control projects of Luhuagou debris flow of Heishui county waschecked, accepted and assesed in provincial level in 1987. On the projectplanning "the principle is rational", "the planning is correct", "themeasures are appropriate" .On projects "the design is accurate","makinga new trial on structural form", "construction and management arerigorous", "quality is excellent" .The project was regarded as all-excellentproject controlling debris flow on province-level. The paper analysed the formative conditions of debris flow gully.Itcomprehensively related to the idea,principle,programme and measuresof the planning, introduced idea principle, standard and new structureof the designation.At last it discussed the construction,management andits effects, etc..

    Reference
    Related
    Cited by
Get Citation

谭万沛,袁锡明.芦花沟泥石流形成条件及其治理工程[J].水土保持通报英文版,1989,(6):61-65,60

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 01,2014
  • Published: