Countermeasures and Characteristics of the Second Phase Project for Major Administration in Yellow River Basin
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The second phase project for the major administration of soil and water conservation in Yellow river basin is accounted summarily.since it is implemented in 1993, the quality, the scale and the criterion have been continuously improved and the benefits more obviously, for the state has attached more importance to soil and water conservation work.Meanwhile, the new situat lon, new characteristics and new problems during the major administration are analyzed.Then, the exist problems are found, and the corresponding countermeasures are formulaed.Therefore, an important instruction is provided for the mayor administrative work and the economical development in the future.

    Reference
    Related
    Cited by
Get Citation

王侠.黄河流域水土保持重点治理二期工程的特点与对策[J].水土保持通报英文版,1996,(2):58-63

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 10,1995
  • Revised:
  • Adopted:
  • Online: November 28,2014
  • Published: