Research on A New Construction Technology of A Key Project for Gully Harness
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A new construction method is analysed,that is to construct a dam for intercepting flood and storing water in the earlier stage of a project,and pouring water into the thrown pole for consolidation,and sinking soil into water to add to the dam by using directional blasting.As is verifyed by a gully correction project named Madihao in WulanCabu league of the Inner Mongolia.The problems showing in the construction and theory of the technology are analysed.So do the treatment method of these problems.

    Reference
    Related
    Cited by
Get Citation

闫宇振,崔中兴.治沟骨干工程施工新技术研究[J].水土保持通报英文版,1997,(2):14-17

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 14,1996
  • Revised:
  • Adopted:
  • Online: November 28,2014
  • Published: