A Study on Drawing up Budgetary Estimate Quota of Terraced Field
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Terraced fields is one of the basis measures on soil and water conservation construction, especially on the loess plateau, in which the amount of the sloping fields is 49.2% of the total fields. Along with the nation's starting the construction of soil and water conservation overall, and putting it into capital construction, to drawing up the quota of budgetary estimate of soil and water conservation is more and more important. Combining with drawing up the way of working out the budgetary estimate and the quota of budgetary estimate of initial design on soil and water conservation project of the Yellow river basin, the way of work out the budgetary estimate of terraced fields, and the calculated unit, subtitle installed, the step distant, manpower, mechanism and consume material delimited are discussed. It talked about the rate of drawn fee to the unit price and the unit price of the project. In order to test the reasonableness of the quota of budgetary estimate, an example are taken for analysis.

    Reference
    Related
    Cited by
Get Citation

梁其春,常福双,李鸣,卜杰华,薛顺康,田杏芳,任杨俊.梯田工程概算定额编制研究[J].水土保持通报英文版,2001,(5):41-44

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 19,2001
  • Revised:
  • Adopted:
  • Online: November 28,2014
  • Published: