Primary Exploration of Soil Erosion and Harnessing Technologies of Gongbo Gorge Hydropower Station in Upper Reaches of the Yellow River
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Considering the construction of the Gongbo Gorge Hydropower Station in the upper reaches of the Yellow river, and the areas unique geology, soil and climate, the different harness areas are identified in both the major and subsidiary project construction regions. On the basis of an analysis of the causes of soil erosion, methods combining project treatment with vegetation treatment are adopted, and the main treatment measures suited to the area are brought forward. This study also provides references relating to the exploitation and construction of homogeneous hydropower stations and the treatment of soil erosion in the upper reaches of the Yellow river.

    Reference
    Related
    Cited by
Get Citation

王海,星玉寿.黄河公伯峡水电站水土流失预防及治理技术初探[J].水土保持通报英文版,2003,(5):66-69

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 03,2003
  • Revised:September 10,2003
  • Adopted:
  • Online: November 28,2014
  • Published: