Effect and Countermeasures of Reconstruction Project to Increasing Speed of Lanzhou-Xinjiang Railroad on Soil and Water Loss in Wind-sand Area
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Calculation by means of existing forecast factors can enable matter element analysis to have forecast functions. Continuously readjusting the grade lim it value(classical domain and joint domain)of every factor can maxim ize the ratio of historical runoff to actual runoff production in a drainage basin. It is shown by example that this is a new and effective method for runoff production forecasting in drainage basins.

    Reference
    Related
    Cited by
Get Citation

陈家琪.兰新铁路风沙区提速改建工程对水土流失的影响及防治措施[J].水土保持通报英文版,2004,(4):67-70

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 17,2004
  • Revised:
  • Adopted:
  • Online: November 26,2014
  • Published: