Opinions on Demonstration and Test of Warp Land Dam System Construction
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By reviewing the development history of warp land dams construction in soil and water conservation, this article expounds the important significance in doing well in warp land dam construction demonstration and shows the driving roles of the demonstration plays in the dam construction. Focusing on the four phase of feasibility study,design construction management,operation and maintenance in warp land dam construction,some ques?tions related to warp land dam construction for demonstration,attention for which should be attached are analyzed. Also the advantages of conducting warp land dam system construction with individual tributary as one unit are i?dentified in terms of soil and water conservation in the Yellow River basin and warp land dam development for a long run and some crucial circles in implementing warp land dam warp land dam system construction in tributary dam system are listed,aiming at providing reference for counterparts eng aging in warp land dam construction.

    Reference
    Related
    Cited by
Get Citation

薛顺康,王答相.淤地坝系试点示范建设浅见[J].水土保持通报英文版,2004,(6):99-102

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 20,2004
  • Revised:
  • Adopted:
  • Online: November 26,2014
  • Published: