    Abstract:

    The deposited volume of each check dam layer was determined by investigating the status of check dams on the loess plateau , digging typical check dams , carrying out the sectional analysis , utilizing reservoir storage and measuring deposited thickness of a layer. Single erosive rainfall was ascertained according to the principle of“more rain , more sediment yield”. Correlation analyses of deposited volume with the maximum rainfall intensity in thirty minutes (I30) , rainfall amount (P) , rainfall erosivity (R) and average rainfall intensity ( I) were made , the re-sult of which indicated close relationships among them. Relationships between deposited volume and the three in-dexes were then established. A good fitting plot between calculated result and observed data was found. The re-search offers a theory basis for the study of water2induced damage.

    Reference
    Related
    Cited by
Get Citation

魏霞,李占斌,李鹏,鲁克新,李勋贵.黄土高原典型淤地坝淤积机理研究[J].水土保持通报英文版,2006,(6):10-13,31

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 20,2005
  • Revised:September 20,2006
  • Adopted:
  • Online: November 26,2014
  • Published: