Problems and Countermeasures in Prophase Work on Soil and Water Conservation of Yangtze River Management Project in Hubei Province
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Basic information and remarkable achievements of Yangtze River Management project of Hubei Province in the recent 20 years were summarized.By taking the seventh stage of Yangtze River Management project of Hubei Province as an example,problems in drawing up feasibility report on the Yangtze River Management were presented in the aspects of project area selection,minor watershed division,characteristic minor watershed selection,management measure,and so on.Through the analysis of these problems,suitable countermeasures and suggestions were proposed,including principles when choosing watershed,requests and contents of watershed regionalization and soil and water investigation,details in sloping land management,slope water system,and diminutive irrigation and soil conservation design.

    Reference
    Related
    Cited by
Get Citation

马根录,吴遵雄.湖北省“长治”工程水土保持前期工作存在问题探讨[J].水土保持通报英文版,2008,(6):177-179

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 11,2008
  • Revised:October 23,2008
  • Adopted:
  • Online: November 26,2014
  • Published: