Existing Question and Optimized Suggestion of Runoff Plots in Soil and Water Conservation Monitoring Stations in Guizhou Province
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article analyzed the existing questions in the management and observation of the slope runoff plots of the 8 monitoring sites that were built in the first phase of monitoring network and information system project of soil and water conservation in Guizhou Province. Some existing lacks of slope runoff plots in the layout,design and construction were summarized. Finally we put forward some suggestions: In the future construction of slope runoff plots, reduction of the observation labor intensity and running attention load should be considered,and the monitoring sites should be chosen together as soon as possible, the observation roads and the catchment facilities should be optimized for monitoring convenience, also the supervision and the management of the construction should be intensified and the construction quality need to be improved. Shortly, the monitoring stations should be constructed up to top standards for the long-term sustainable op- eration and maintenance.

    Reference
    Related
    Cited by
Get Citation

顾再柯,刘凤仙.贵州省水土保持监测点径流小区存在问题与优化对策[J].水土保持通报英文版,2009,(2):18-20

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 07,2008
  • Revised:November 16,2008
  • Adopted:
  • Online: November 26,2014
  • Published: