Application of HBV Hydrology Model in Bailong River Basin
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    [objective] The conceptual semi-distributed rainfall-runoff model, HBV, was examined in the Bailong river basin upstream the Wudu hydrological station, and it was applied to simulate the daily runoff in order to evaluate the applicability of the model in the area. [Methods] The parameters of HBV were calibrated and validated on the basis of sensitivity analysis, and the annual variation characteristics of the runoff and precipitation were analyzed. [Results] During the calibration period, the Ens was 0.65, and the R2 was 0.74; and during the verification period, the Ens was 0.60 and R2 was 0.70. Both of these indicated that the model could be successfully applied to simulate the daily runoff. Beside, the response of flooding to precipitation can be simulated better to HBV model. [Conclusion] The HBV model can be used for further studies of the impacts of climate changes on water resources.

    Reference
    Related
    Cited by
Get Citation

王有恒,谭丹,景元书. HBV水文预报模型在白龙江流域的应用研究[J].水土保持通报英文版,2015,35(3):218-221

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 18,2014
  • Revised:May 15,2014
  • Adopted:
  • Online: April 05,2016
  • Published: