Rainfall-simulated Erosion and Sediment Yield of Rubbish-dump in Dry Upland of Northern Weihe River
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    [Objective] The process and mechanism of erosion and sediment yield of rubbish-dump in dry upland of Northern Weihe river were illustrated to provide scientific bases for the prevention and control of rainfall erosion on rubbish-dump. [Methods] Experiments of erosion and sediment yield were conducted on rubbish dumps with two slope gradients(steep slope and tiled dump) and rainfall simulation intensities(1,2 and 2.0 mm/m). [Results] When rainfall intensity I was at 1.2 mm/min, the sediment yield on the steep slope dump was 117.94 kg, an increment of 107.08 kg was observed in comparison with the one on tiled dump of 10.86 kg. When rainfall intensity was at 2.0 mm/m, the sediment yield on steep slope dump got an increment of 225.72 kg in contrast to the one on tiled dump. The energy of erosion(E), including the consume energy(Estartup sediment,Emove sediment), and the dragging resistance at bottom plate(F) were elucidated: The existed space and soft layer between rubbish-dump and the original landform below it can reduce the E start up sediment, the energy of erosion(E) was mainly consumed by moving sediment. [Conclusion] The current with the sediment yield will keep a high speed and a strong dragging force from bottom plate(F). As a result, rill erosion was strengthened.

    Reference
    Related
    Cited by
Get Citation

陈见影,来凤兵,常占怀.渭北旱塬垃圾堆积降雨侵蚀试验研究[J].水土保持通报英文版,2016,36(4):216-219,226

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 05,2015
  • Revised:September 16,2015
  • Adopted:
  • Online: September 21,2016
  • Published: